| Cell formation, grading, or aging preparation |
Formation supplier, aging supplier, and cell supplier |
Cell format, chemistry context, voltage, current, power, channel count, formation profile, aging duration, fixture or rack, software, documents. |
Model fit, channel route, method, chemistry fit, software, documents, price, delivery, warranty, and support require review. |
| Module or pack assembly validation |
Module supplier, pack supplier, and BMS supplier |
Module or pack layout, BMS path, voltage/current/power range, charge/discharge profile, fixture, safety, software/data export, and document needs. |
BMS protocol, fixture suitability, profile suitability, safety/site fit, software compatibility, documents, and terms require review. |
| Pack EOL, traceability, or automated station |
Pack EOL supplier, ATE supplier, and system integration |
Station count, cycle time, final-test sequence, fixture, barcode/MES, data format, operator flow, traceability fields, and site power. |
Station design, interface behavior, fixture suitability, traceability workflow, software, site, price, delivery, and support require review. |
| Factory QA or procurement comparison |
Factory QA, procurement guide, and sample inquiries |
Production stage, customer segment, battery application, range, station count, documents, QC, destination, quantity, timeline, evidence needs. |
Price, delivery, warranty, inventory, customer-facing claims, and support scope stay review-gated. |